Free printable · Grades 6 to 12
Free long-term project planner
A one-page planner that breaks a big assignment into steps, each with a finish-by date and a box to check when it's done, plus a place to write what the student will need.

Download free PDFNo email needed. Print as many as you need.
Make your own in seconds
Ask for a project planner for a specific assignment or with your own steps, and SCAFLI makes it.
Try asking for:
- “project planner”
SCAFLI is in early access. The free PDF above needs no sign-up.
What it is
A planning support for long-term projects and research papers, middle and high school.
How to use it
- Write the due date first, then plan backward.
- Break the project into steps of a day or two each.
- Put the finish-by dates on a calendar too.
Three quick tips
- Check in at each finish-by date.
- Celebrate steps, not just the final project.
- Keep it with the project materials.
Questions
- What grade is it for?
- Middle and high school, and older elementary students with big projects.
- Can I add my own steps?
- Yes. Ask SCAFLI for a planner with your steps.
- Is there a homework tracker?
- Yes. There is a free homework and assignment tracker too.
A starting point for your own professional judgment. Use initials only on any page about a student.